KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  7-23-2013
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Aft skin lay-up

To form a prepreg, I cut the three plies of fabric using the aluminum skin as a template, placed them on a sheet of plastic poured the resin on the glass frabic put a sheet of plastic over that and squeegeed out the resin. then cut the laminate to size (1" excess), peeled the plastic sheet off and laid it on the layup table. Seperator over that, breather over that, some old rags for a vacuum path to the vacuum tube and baged over that. I cured the laminate for 2 hours under vacuume, and 6 hrs at room pressure.
' style=

Creating the prepreg laminate

Creating the prepreg laminate

' style=

breather ply over laminate

breather ply over laminate

' style=

vacuum bagged

vacuum bagged

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.