Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
All
4-24-2013
< Previous Log Entry
Next Log Entry >
Date:
4-24-2013
Number of Hours:
4.00
Manual Reference:
Brief Description:
Pressure tested tank with home-made manometer
Leak tested the RHS fuel tank same as the LHS tank last year. How time flys! As on the LHS tank I have a small leak under the fuel cap.
Manometer set-up
3.5 ft = 1.5 psi
air valve and water reseivour
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
460
1984
Aft Fuselage
20
138
Aileron
13
71
Assembly
9
9
Builder
1
Canopy
12
37
Center Fuselage
31
165
Controls
9
15
Cowling
16
16
Demo Flight
2
Distractions
2
Electrical
28
156
Empennage
3
2
Engine
7
8
Fiberglass Tip for V
9
68
Flaps
6
44
Flight Test
5
5
Forward Fuselage
27
139
Fuselage
6
11
FWF
33
57
Horiz Stabilator
29
131
Instruments
42
201
Interiour
6
35
Landing Gear
9
31
Paint
10
10
Project
1
Rudder
11
47
Seats
5
65
Shop
4
Tips
7
0
Tools
3
Trim Tab
1
8
Vertical Stablizer
13
75
Wings
80
440
Copyright © 2001-2024 Matronics. All Rights Reserved.