KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  4-12-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Pitot tube construction

Built up the Pitot/AOA tube. Since I am installing the electricly deiced version I built a little support bracket that conects the two tubes and the wires. The Rans optional extension extrusion for the Dynon probe doesn't fit vey well and took some filing and squishing to work, but it turned out OK.
' style=

Tapping the probe for the extension

Tapping the probe for the extension

' style=

Support bracket

Support bracket

' style=

Probe complete

Probe complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.