KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  7-23-2012
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Building up the frame

Working on assemblingthe frame and drilling torivet holes to full size. Blended-out minnor nicks and sharp edges on the front spar.
' style=

Ribs and spars

Ribs and spars

' style=

This sharp edge ot the spar cap run-out needs to be blended

This sharp edge ot the spar cap run-out needs to be blended

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.