KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  5-12-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Started Flaps

Clecoed flap frames together and drilled out to full size. Used a 6" long bit to drill the nose ribs. Got a neighbor, Ed, to help with the rolling of the flap skins at the leading edge. We rolled it with a 1.15 inch dia steel conduit. Duct taped the leading edge of the skin to the conduit and rotated the conduit over the skin using short pipes placed through holes as handles. Took two people cranking fairly hard, but less than 30 mins to do the job.
' style=

Flap frames going together

Flap frames going together

' style=

nose rib drilling

nose rib drilling

' style=

rolling skins

rolling skins

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.