KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  3-3-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Fuel tank prep

Since the tank sits on a line of rivet heads from the torque angle, I sanded aslight recess in the tank to provide for the river heads. Wired the fuel sender sense wire with a ground wire that will go from the sender float to the instrument panel tied to a ground jumper to the wing rib.
' style=

Sanded a relief grove

Sanded a relief grove

' style=

Sense wire and ground with ground jumper

Sense wire and ground with ground jumper

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.