KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  11-27-2010
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Main Landing Gear legs

Filed as required the landing gear attach points and installed the legs in the with bolts in the very tight holes. Then installed the axial's and brakes. Mounted the tires on the wheel rims.
' style=

Main gear leg installed

Main gear leg installed

' style=

axel and brake installed

axel and brake installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.