KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  11-12-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Nose landing gear truss install

drilled the nose landing gear truss to fire wall. the firewall holes were undersized and the truss came with full size holes, so I step drilled the firewall leaving one of the lower holes 1/64 undersize, then positioned the truss on the firewall and drilled and reamed the final hole full size.
' style=

Nose landing gear truss

Nose landing gear truss

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.