KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  10-30-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Torque Tube Bushings and Control stick

Wraped a few layers of masking tape and a final layer of Emery paper around a socket wrench socket with a short extention, chucked it into the drill press and reamed the ID of the Flap Torque Tube Bearing Blocks. Need to be carfull not to allow the sanding surface to get to hot. This method worked pretty well and the job was finished in about 4 hours. Also installed control stick.
' style=

Reaming Bearing Blocks

Reaming Bearing Blocks

' style=

Controls

Controls

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.