KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  10-1-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  preparing the center fuselage for joining

Spent a few after work days finishing some odd jobs prior to starting the fuselage join. I decided to not do anything about the rivet hole thur the rib into the bulkhead flange that falls on the edge of the flange. There will be a gap between parts under the rivet and a notch in the flange, but I don't think it will be a problem. Reamed the bolts thru the landing gear block.
' style=

Form block for bending a radius in  baggage bulkhead flange

Form block for bending a radius in baggage bulkhead flange

' style=

This hole c/t the baggage bulkhead falls on the edge of the flange

This hole c/t the baggage bulkhead falls on the edge of the flange

' style=

Reaming the landing gear block

Reaming the landing gear block

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.