KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  7-3-2010
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Mounted vertical stabilizer

Mounted Vertical Stabiliser. I had drilled the rear spar mount holes full size when I built the stabiliser so I had to be careful matching the holes to the 1/8 inch pilot holes in the rear bulkhead. Verified the angle of the stabiliser ( it was within +/-0.2 degrees of vertical) and drilled the upper close out to loack it in.
' style=

aft fuselage coming together

aft fuselage coming together

' style=

R.S. c/t bulkhead 5

R.S. c/t bulkhead 5

' style=

F.S. c/t bulkhead 4

F.S. c/t bulkhead 4

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.