Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
All
6-13-2010
< Previous Log Entry
Next Log Entry >
Date:
6-13-2010
Number of Hours:
6.00
Manual Reference:
Brief Description:
Bulkhead 5
Spent this week working on bulkhead #5, "honed" out the stabilator trim bellcrank bushings with emory cloth wraped around a drill bit. slowly built op the diameter of the "hone" with tape wraped under the emory cloth. Seemed to work OK.
poor mans hone
a lot of detail work here
overview
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
All
Aft Fuselage
Aileron
Builder
Center Fuselage
Controls
Demo Flight
Distractions
Electrical
Empennage
Flaps
Forward Fuselage
Fuselage
Horiz Stabilator
Instruments
Landing Gear
Project
Rudder
Seats
Shop
Tips
Tools
Trim Tab
Vertical Stablizer
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.