KitLog pro

Powered By Kitlog Pro v2.0

Art's Web Site
' style=
Date:  1-5-2018
Number of Hours:  1.50
Manual Reference:  Page 6-4
Brief Description:  Assembling the Vs

Started the process of assembling the Vertical Stabilizer today. Sorted out all the parts after I received them back from the painter and inspected the paint job, just to make sure it was all good.

While the parts got labeled, the small distinctions between parts (i.e. which VS1010 was the upper and which was the lower) were lost in the paint process. To Figure this all out, cleco'd everyting together to find the right orientation and relabled the parts as needed.

Primer on the R1007B parts was a bit thin, so I hit it quickly with a rattle can of Zinc Phosphate for good measure.

Will start riveting next time...
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.