KitLog pro

Powered By Kitlog Pro v2.0

Dons Web Site
' style=
Date:  3-11-2009
Number of Hours:  5.00
Manual Reference:  
Brief Description:  More drilling

Finished match drilling the aft and front cap strips for the right rear spar. Then I drilled the aft cap strips to the webbs for the left rear spar and then started match drilling the aft caps to the front caps for the left spar.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.