Pg. 18-2 Step 1: Completed Actuation Bracket by drilling holes. Step 2: Refabricated two more Pivot Brackets. Pg. 18-3 Step 1: Clecoed the Spar , Outbd. Nose Ribs, Counterbalance and Outbd. Nose Skin. Step 2: Match drilled #30 the the Most Inbd. and most Outbd. Nose Ribs using the technique previously decribed. Step 3: Unclecoed the assy. and deburred the holes in the Counterbalance. Step 4: Riveted the Lt. and Rt. Counterbalance Weights to the Outbd. Nose Ribs. Used the wedge technique to pull the rivets with the close quarters hand riveter.