KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  5-16-2009
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Flapperons Pg. 18-2, 18-4

Pg. 18-2
Step 1: Attempted to fabricate Actuation Brackets. On one I drilled the 1/4" in the wrong place. On the other I cut the line too close to the other leg of the angle. Going to order new material.
Step 2: Sucessfully fabricated 2 Pivot Brackets. Then I discovered I still had to make 2 more. Something to do for Monday.
Step 3: Flutted the Inbd. and Outbd Nose Ribs. Primed the Nose Ribs.
Pg. 18-4
Step 1: Separated the A-1208 Brackets. Deburred and primed the brackets.
' style=

A-1208 Brackets

A-1208 Brackets

' style=

Actuation Brackets

Actuation Brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.