Pg. 18-2 Step 1: Attempted to fabricate Actuation Brackets. On one I drilled the 1/4" in the wrong place. On the other I cut the line too close to the other leg of the angle. Going to order new material. Step 2: Sucessfully fabricated 2 Pivot Brackets. Then I discovered I still had to make 2 more. Something to do for Monday. Step 3: Flutted the Inbd. and Outbd Nose Ribs. Primed the Nose Ribs. Pg. 18-4 Step 1: Separated the A-1208 Brackets. Deburred and primed the brackets.