KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  1-2-2010
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Fwd Upper Fuse

Reworked the Map Box. Attempted to install felt lining in the box, but had problems final-drilling the Map Box hole for LP4-3 rivets. The drill bit kept snagging the lining and tearing it, so I removed it. Next time I'll predrill the holes before lining the box.
Marked and drilled the #30 holes in the Map Box door. Countersunk the #40 Panel holes and the #30 Map Box door holes. Flush riveted the door to the hinge half. Installed the door.
Drilled the door, Panel and Map Box flange 1/4". Enlarged the the hole through the Panel and Map Box flange to 7/16" using a Unibit.
The Camloc can be installed through the door by compressing the spring then passing one ear at a time through the 1/4" hole.
' style=

Felt Lined

Felt Lined

' style=

Door Open

Door Open

' style=

Door Closed & Locked

Door Closed & Locked

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.