KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  12-2-2009
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Rollover Struct. / F-1207 Bhd

Pg. 24-05
Step 4: Installed the snap bushings in the F-1207D-L Baggage Bulkhead Channel.
Step 5: Clecoed and riveted the F-1232A Roll Bar Brace to the
F-1232B-L&R Roll Bar Brace Brackets. Clecoed the assembly to the Roll Bar Assy and Baggage Bulkhead. Machine countersunk the holes in the upper side of the Roll Bar Brace.
Step 6: Clecoed and riveted the F-1207K Brace Angle to the Rt Baggage Bulkhead.
' style=

F-1207D-L Snap Bushings

F-1207D-L Snap Bushings

' style=

Roll Bar Brace

Roll Bar Brace

' style=

F-1207K Brace Angle

F-1207K Brace Angle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.