Section 23 Primed the Baggage Area and Center Section that were originally prepped for painting. Pg. 23-04 Step 3: Riveted the F-1202E-L&R Bulkhead Side Channels to the F-1202F Bulkhead. Rivetd the F-1202G-L&R Bulkhead Side Channels to the F-1203A Bulkhead. Step 6: Riveted a Fuselage Pin Latch to each Arm Rest. Step 7: Riveted the Arm Rests to the F-1202E-L&R Bulkhead Side Channels. Riveted the Arm Rests to the Fwd Bulkhead Sides and Arm Rest Brackets. Step 8: Inserted the Canopy Decks and Longerons onto the fuselage skeleton. Clecoed the Canopy Decks to the F-1203G-L&R Bulkhead Side Channels. Pg. 23-06 Step 6: Reassembled the Canopy Decks, Longerons and Side Skins.