KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  10-20-2009
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Fuel Tank

Pg. 37-03
Step 1: Riveted the Fwd Baffle and T-1208 Baffle to the Main Tank Skin and together. Verified the fuel passages were open and the outbd passage and tool holes were sealed.
Step 2: Riveted the Fwd Baffle to the Fwd Bulkhead.
Step 3: Adjusted the joggle of the Aft Tank Bulkhead top flange.
Step 4: Riveted the Aft Tank Bulkhead to the Main Tank Skin.
Step 5: Applied sealant to the inside bottom corners.
Step 6: Riveted the Attach Angle to the Aft Tank Bulkhead.
' style=

Baffles Installed

Baffles Installed

' style=

Aft Tank Bulkhead

Aft Tank Bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.