Step 4: Clecoed the Doublers, Pitch/Trim Servo and Tray together. Step 5: Match-drilled and final-drilled the #27 holes in the Doublers, Pitch/Trim Servo and the Tray. Step 6: Used Hardware to attach Pitch/Trim Servo to Tray. Step 8: Deburred and primed the Link. Step 9: Installed Polymer Bushing into link. Step 10: Filed the bushing to size. Step 11: Installed snap bushing and routed wires through the bushing. Step 14: Installed the cushioned clamp to support the wires