Primed the J-Stiffener edge of the Lt. & Rt. Lower Skins. Step 3: Attached Lt. & Rt. Lower Skins to the frames. Step 4: Installed the string for the Stabilator Cables. Step 5: Routed the Pich/Trim Wire from the Aft Bulkhead to the fwd end and secured with tie wraps. Step 6 & 7: Installed plastic tubing from Lt. & Rt. Static Source to the Tee. Step 8: Routed the 1/4" polypropylene tubing from Tee forward and secured. Step 1: Separated the Snap Bushing Brackets, deburred and primed.