KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  3-31-2009
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Tail Cone Pg. 10-8 Stp. 3-7, 10-9 Stp 1

Primed the J-Stiffener edge of the Lt. & Rt. Lower Skins.
Step 3: Attached Lt. & Rt. Lower Skins to the frames.
Step 4: Installed the string for the Stabilator Cables.
Step 5: Routed the Pich/Trim Wire from the Aft Bulkhead to the fwd end and secured with tie wraps.
Step 6 & 7: Installed plastic tubing from Lt. & Rt. Static Source to the Tee.
Step 8: Routed the 1/4" polypropylene tubing from Tee forward and secured.
Step 1: Separated the Snap Bushing Brackets, deburred and primed.
' style=

Static Source

Static Source

' style=

Plastic tubing

Plastic tubing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.