Step 1: Riveted Attach Brackets together and pressed in bushings. Step 2: Slightly flutted Bulkhead flange as required. Step 3: Clecoed the the Fuselage Bulkhead to the Bulkhead Doubler. Step 4: Clecoed the Tail Skid Bracket to the Bulkhead. Step 5: Match-drilled the #30 holes into the Tail Skid Bracket. Step 6: Final-drilled the #12 holes into the Bulkhead. Step 7: Clecoed the Attach Brackets and Tail Skid to the Bulkhead Assy. Step 8: Riveted the Fuselage Bulkhead to the Doubler. Step 9: Riveted the Attach Brackets and Tail Skid Bracket to the Assy.