Pg. 31-12 Step 1: Routed the remaining wires of the WH-RV12-TUNNEL harness through the F-1206A and F-1207B Baggage Bulkheads. Step 2: Loosened the System Blocks for passage of the Trim Wires. Continued routing the wires along the same path as the Static Line. Retightened the System Blocks