KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  8-3-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Flight Controls

Put torque seal on the torqued nuts and bolts.
Pg. 32-13
Step 2: Installed the .197 X .313 X .968 bushing between the F-1250 L&R Pulley Brackets.
Step 3: Secured the Forward Stabilator Cables to the Control Column. Tightened to allow the cables to swivel within the horns on the Control Column
Step 4: Routed the aft end of both Forward Stabilator Cables over the bushing and through the hole in the Aft Intercostal.
Step 5: Installed the two pulleys assuring the cables were between the bushing and the pulleys.
' style=

Forward Stabilator Cables Connected

Forward Stabilator Cables Connected

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.