KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  4-3-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Canopy Installation

Pg. 34-15
Step 5: Sanded the epoxy with 220 and 320 grit paper. The contour and surface finish appear better than I had expected when I started. Applied filler primer to the epoxy lay-up. I'll check for pin holes next session and blend the epoxy into the side skirts.
Pg. 34-16
Step 1: Drilled with a #30 bit to verify location of the canopy pivot bolts, then enlarged with a 3/8" drill bit. Continued to enlarge the hole to 21/32" with a Dremel milling bit, enough to get a 3/8" socket onto the bolt head.
' style=

Filler Primer Left Side

Filler Primer Left Side

' style=

Filler Primer Right Side

Filler Primer Right Side

' style=

Dremel Milling Bit

Dremel Milling Bit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.