KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  3-29-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Canopy Installation

Pg. 34-15
Step 5: Put Bondo on low spots and pin holes. After curing sanded with 80 grit sand paper.
' style=

Rough Sanded Bondo Left Side

Rough Sanded Bondo Left Side

' style=

Rough Sanded Bondo Right Side

Rough Sanded Bondo Right Side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.