KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  3-20-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Canopy Installation

Pg. 34-15
Step 5: Removed the second layer of electrical tape and sanded with 150 grit until the aft edge was down to the first layer. Discovered I have some areas at the aft pointed location and bottom edges on both side that do not have enough coverage. Will have to contact Van's for directions.
' style=

Missing glass

Missing glass

' style=

Short Glass Coverage

Short Glass Coverage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.