KitLog pro

Powered By Kitlog Pro v2.0

N905AD Web site
' style=
Date:  3-26-2006
Number of Hours:  10.00
Manual Reference:  8-20
Brief Description:  Panel Work

Completed work on tail fairing, skirts, and inspection plates. Drilled out elevator counterbalance weights for proper static balance. Worked on both left and right vent outlets and support brackets. Completed drilling and prepping all parts for both left and right vents. Now ready for installation. Worked on instrument panel attach brackets on both left and right sides. Completed drilling of these brackets also ready for installation. Manufactured the F-703B/C angles and drilled and clecoed these to the instrument panel. Buffed angles and intrument panel for a good fit.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.