KitLog pro

Powered By Kitlog Pro v2.0

Building an RV8
' style=
Date:  9-2-2006
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Right Tank Ribs Sealed and Riveted

Bill Pinney came over today and helped me rivet and seal the remaining four inboard ribs in place. We got in a good system and timing and didn't take too long. I had enough sealer left after the last rib that I went ahead and sealed/ riveted the most inboard rib in place. Tomorrow I should be able to get the capacitance fuel level plates and wiring and the vent line all setup as well as the reinforcements for the nose on the inboard rib and the fuel flop tube sealed in place. Then maybe the most outboard rib and perhaps (if I have enough sealer) I can get the baffle sealed in place on Monday and leave the right tank to cure for the week I am gone to work. We shall see.
' style=

RIght Tank Inboard Ribs

RIght Tank Inboard Ribs

' style=

Another view of the right tank ribs

Another view of the right tank ribs

' style=

Most Inboard Rib riveted and sealed in place

Most Inboard Rib riveted and sealed in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.