KitLog pro

Powered By Kitlog Pro v2.0

Building an RV8
' style=
Date:  6-25-2006
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Prepare Main Spars (Continued)

Finished the prep of the two main spars by bolting in place the tie-down assemblies along with the bellcrank brackets as shown below.
' style=

Tie-down assembly bolted in place

Tie-down assembly bolted in place

' style=

Reverse side of tie-down assembly showing the bell crank brackets

Reverse side of tie-down assembly showing the bell crank brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.