Its been awhile since my last entry. All I have done since then is to rearrange the garage to make room for building the wing jig. I moved the paint booth and the work benches and stored away the empennage components. Entry today is prompted by the Wing Kit finally arriving. I went right to work on the inventory. Photos below show the two crates totaling 395 pounds that it was shipped in. The long crate held the two wing spars and the longerons for the fuselage (shipped now since the spars required a long narrow crate anyway). Most of the ribs and all the skins were in the other box. See next entry.