KitLog pro

Powered By Kitlog Pro v2.0

Building an RV8
' style=
Date:  2-18-2006
Number of Hours:  2.50
Manual Reference:  Assemble HS
Brief Description:  Positioned the forward Spar in left HS

After getting the Vertical Stab parts hanging up to dry after prepping for primer, I moved back to the Horizontal Stablizer. The plans call for cleco'ing in place the forward spar on the left HS after the center forward rib is riveted on top and bottom. Was comforting to see how well the forward spar lined up in the left HS with all the holes perfectly aligned. After getting all the clecos back in it was time to blind rivet the aft center rib to the forward spar and the forward center rib. Sure am glad I made those clothespin stands, makes it a lot easier to work on the HS. Fortunately, my daughters boyfriend Billy was around and was able to help me get the blind rivets lined up in place (reaching in those tight spaces is tough with my big hands). We eventually got all three blind rivets lined up and popped in place. Time to take my wife to dinner.
' style=

Billy popping the second of three pop rivets in place

Billy popping the second of three pop rivets in place

' style=

Me working on the third blind rivet

Me working on the third blind rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.