KitLog pro

Powered By Kitlog Pro v2.0

Alans Web Site
' style=
Date:  2-28-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  up dating instrument panel

Continue to modify instrument panel to make ease of maintenance. Drill holes for instruments in engine management side of panel. Fitted gauges and switches,. Made a new gaurd for ignition AB run switch. pictures to follow. More than a year has past since the last time I did any work on the Ch601XL. I recently retired so I plan on working on my project as often as I can. I added a flap position gauge and changed the cheap rocker switches with good quality toggle switches. updated the a/b run switch gaurd and relocated it. The counsel will hold the fuel pressure and the dual fuel level gauges, 3 lights, oil pressure, park brake and carb ice. The counsel will house the fuel select valve, and the elevator trim along with the aliron trimm and park cable. i might squeze an spare light in to the left of the trim gauge. I also instaledl a clock just below the flap gauge.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.