KitLog pro

Powered By Kitlog Pro v2.0

Alans Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-10-2008
Number of Hours:  1.50
Manual Reference:  6-K-1
Brief Description:  drill holes in tanks

Drilled holes in tanks for weld in bungs.for return fuel line installation.. Located and drilled hole for weld in bungs for fuel gaurdian sensors. Set fly cutter to cut holes for fuel gauge sending units in tanks. welded aluminum bungs in tanks, for return line and fuel gardian sensor. Layed out fuel plumping configuration of possible installation design for firewall mount fuel pumps and gascolator. as per WW design.
' style=

return line bung welded in, sensor bung

return line bung welded in, sensor bung

' style=

possible fuel system pump layout

possible fuel system pump layout

' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.