KitLog pro

Powered By Kitlog Pro v2.0

Alans Web Site
' style=
Date:  1-12-2008
Number of Hours:  4.50
Manual Reference:  6-T-2A
Brief Description:  riveted skelton, drilled elevator skins

After deburring and corrision protection. Assembled horizontal sabilizer skeleton with clecoes. Square assembly and fastened to work bench so would not move. Double checked that everything is square. Proceeded to rivet entire skeleton.
Opened box with horizontal stabilizer skin fitted over skeleton, had to file holes for spar brackets so skin would line up to lines marked 10mm lines marked on spars and ribs. Drilled entire skin with # 30 drill bit and than went over with # 20 drill clecoed as I drilled.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.