Brief Description: drilled all pilot holes with #30 drill bit
drilled all holes and clecoed removed all clecoes and deburred entire bottom side of stabilizer. coated with chromite corrision protector clecoed every second hole and riveted entire stabilizer leaving the elevator hinge clecoed for later assembly.