Received 2 aluminium coil holders from CiP1.ca. Installed the holders with coils on firewall. Drilled and taped holes for air cool blast cover. Taylor made the ignition coil wires and installed them. The pass through will be installed on top of firewall ledge. Need to debur and rivet next building session. Install hose vent and pass through.I have to figure out where to relieve the cover for the upper and lower engine mount and I want to be able to check and service under the cover with minamal hassel for example changing fuel filter cartiage. The cover might have to be devided into two parts and or I will put a removeable oval access cover on shield. I might have to reverse engineer some of my work. It needs to be service friendly.