KitLog pro

Powered By Kitlog Pro v2.0

Alans Web Site
' style=
Date:  10-25-2016
Number of Hours:  1.00
Manual Reference:  6-G-1
Brief Description:  front landing gear brackets drill

Note I transfered the kitpro software from my old to my new computer. I had some how missed the last 100 hrs of construction in the backup file. But it shows on my web page. It should be ok for now.. After a long break in building I suddenly got the itch."go figer" Nevertheless I ended my last build session installing the front steering bearing and landing gear. tonight I drilled the 1/4 bolt holes that holds the front wheel forks to the steering. I drilled the 6 holes out. I had predrilled the holes the last session in early 2016.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.