KitLog pro

Powered By Kitlog Pro v2.0

HB-YAK GS-2 Sportsman 2+2 kit
' style=
Date:  3-20-2021
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fuel transfer pump installation

Pre-drill the douber, put in place and drill/cleco.
Then prime the part for corrosion proofing.
Then rivet the doubler to the lower skin of the wing.
The rivet press could not reach all the rivets, so we used the rivet gun on one side (me) and Christoph held the bucking barr on the other side.
This is practice for closing the wing.
' style=

Dubbler drilled and clecoed in place

Dubbler drilled and clecoed in place

' style=

Riveted and pump installed

Riveted and pump installed

' style=

Rivets and flat head screw from the outside.

Rivets and flat head screw from the outside.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.