Powered By Kitlog Pro v2.0
HB-YAK GS-2 Sportsman 2+2 kit
Sportsman 2+2
All
3-29-2021
< Previous Log Entry
Next Log Entry >
Date:
3-29-2021
Number of Hours:
1.00
Manual Reference:
Brief Description:
Wing tip fairing preparation
Ajusting the two halves together first with tape from the outside then with dots of glue on the inside.
Taping the halves together
Tac gluing the halves together
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman 2+2 Home
Category
# Logs
# Hours
All
343
1748
Avionics
9
38
Empennage
6
34
Engine
51
288
Final assembly
126
535
Fuselage
37
94
Miscellaneous
13
235
Prop
5
20
Shop Supplies
1
8
System Installation
23
92
SYSTEMS INSTALLATION
23
92
Wings
49
312
Copyright © 2001-2024 Matronics. All Rights Reserved.