KitLog pro

Powered By Kitlog Pro v2.0

HB-YAK GS-2 Sportsman 2+2 kit
' style=
Date:  3-29-2021
Number of Hours:  2.00
Manual Reference:  Step 43
Brief Description:  Seam the Rudder Tip Fairing Together

This part is the preparation berfore seaming the two halves together.
Adjusting, taping, checking in position and tack gluing the two halves together before seaming with glass and resin. The hair dryer pushes the resin into all spaces
' style=

Trimming and taping the halfes together

Trimming and taping the halfes together

' style=

Presenting to the rudder to check OK

Presenting to the rudder to check OK

' style=

gentle heat to help the resin flow

gentle heat to help the resin flow

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.