KitLog pro

Powered By Kitlog Pro v2.0

Aarons Sonex N771AK
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-18-2008
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Delivery & Wing attachment

At long last the Fuselage & wings were delivered to the hangar at the airport. The paint job sparkled a dazzling metallic sheen, with the deep copper color changing to yellows/reds/oranges and even a green hint at sharp angles. This copper color is awesome, metallic anodized. Within a day & a half, the wings are now fully bolted solid and pinned. The Flaps and Ailerons are fully rigged and hooked up also (not shown in pix). Did tail numbers, cleaned plane of all body-shop dust. All that's left is finishing the control hookups and engine cowling/pants/fairings/litte-stuff. Getting close to inspection day! Hopefully within 2 weeks I'll have airworthiness. Right wing had very dissapointing scratching in one spot on top surface, major deflating bummer - gotta figure out how to repair the spot to at least have same color and clear coat. Overall they did a lot of body fixing/improvements elsewhere though. Sweet!
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.