KitLog pro

Powered By Kitlog Pro v2.0

The RV-10 Dream
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-23-2013
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Construcion of Avionics Bench mockup

Dad, Paul and I completed a panel mockup for the pre-wiring of the instrumentation, switches etc...

This will allow us to continue on two streams. Engine and Firewall forward and panel wiring. I have also created a cutout and mounting points ready for the Garmin 650 cage and this I should probably mount sooner than later so as to support the PAR100EX.
' style=

Panel Mock-up for wiring

Panel Mock-up for wiring

' style=

Hole and mounting points for the GTN650

Hole and mounting points for the GTN650

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.