KitLog pro

Powered By Kitlog Pro v2.0

The RV-10 Dream
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-30-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Rearrange workshop, engine mount and front wheels

Today Dad and I rearranged the workshop by spinning the body around and moving the benches. It made a huge difference to the amount of room available for working on the engin and electricals.
I expect that over the coming 4 weeks I can get at the firewall and set that up with the ceramic coating and SS foil. This will ensure quality heat resistance and help manage the tunnel heat.

Once this is complete it will be on to the canope finishing and then engine...... Woo hooo...!!!
' style=

Rearranged Workshop

Rearranged Workshop

' style=

Lots more space

Lots more space

' style=

Wheels are on... hehehehe

Wheels are on... hehehehe

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.