KitLog pro

Powered By Kitlog Pro v2.0

The RV-10 Dream
' style=
Date:  9-1-2013
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Engine work and Avionics

Today Dad and I began laying out the ignition wiring to the spark plug points. It was very interesting to get the right amount of slack in the system and still have it mounted securely.

I definitely think I will revisit this,however at the moment I am happy that they are mounted safely awaiting final zip tieing.

Paul also continued on with the Avionics inside the aircraft and the photo will appear on the next post.

What I did recognise was that the top leads were not secured within the baffled area. I did not like this so went to Keables and got some bolts that were longer than normal. Solution on next post.
' style=

Right side of engine

Right side of engine

' style=

Left side of engine

Left side of engine

' style=

Still to be finally zip tied

Still to be finally zip tied

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.