KitLog pro

Powered By Kitlog Pro v2.0

The RV-10 Dream
' style=
Date:  7-27-2013
Number of Hours:  5.00
Manual Reference:  OP-37 Wiring Kit
Brief Description:  Engine Wiring has begun

Today Paul continued with some more wiring in the cabin, and I began starting to wire up the motor region.

This required a number of bolts to be undone.... I was not happy doing this, however with the torque values now a little clearer, I reset them as required.

The main wires were also sleeved with glass and this should ensure a long life.

As I did not get the Vans, wiring kit, and purchased all of the harware separately, I needed to make the offset tabs for the main wiring. Pretty basic now given how far I am through.

We also fit the Oil cooler as this sort of dictated the way in which the cable clamps would be orientated.

I am looking forward to the final stretch. Yeehaaa!!!
' style=

Alternator Cabling

Alternator Cabling

' style=

Alternator and Starter Motor

Alternator and Starter Motor

' style=

Oil cooler and clamps

Oil cooler and clamps

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.