KitLog pro

Powered By Kitlog Pro v2.0

The RV-10 Dream
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-19-2011
Number of Hours:  10.00
Manual Reference:  39-3.6
Brief Description:  Control Column Fitment

Now I am on to the control column and associated systems. Over the course of the Saturday and Sunday, I test fit, drilled, primed and completed the components of the control system.

With loose conections I have now test fit the components associated with the control rods.

There was an issue however with the drilling of the control columns and they turned out badly. I need to get them welded shut and then I will redo them.
' style=

Central Bell Crank

Central Bell Crank

' style=

Main push rod

Main push rod

' style=

First mock-up of control columns

First mock-up of control columns

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.