KitLog pro

Powered By Kitlog Pro v2.0

The RV-10 Dream
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-9-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Getting Fuse down ready for joining

Well this weekend was dedicated to getting the Fuselarge down from the upper section and getting the benches ready for working on a combined tail and fuse.

Firstly I cut the bench legs in half allowing me to have a half height bench, and (thanks Gess) a walking platform keeping my feet off the floor and warmer. It was a really good idea.

It took quite a while, however, The gantry I installed made it significantly better that it could have been.
' style=

Fuse Down

Fuse Down

' style=

Fuse and Tail

Fuse and Tail

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.