KitLog pro

Powered By Kitlog Pro v2.0

Tony’s RV-7
' style=
Date:  5-20-2020
Number of Hours:  4.00
Manual Reference:  Section 6
Brief Description:  Right Elevator

Right Elevator - Performed the following task on the right elevator:
* Rivet E-703 to E-704.
* Rivet E-610PP, E-611PP, E-00001A & B and platenuts to E-702.
* Rivet E-709 to E-702 (flush heads forward).
* Rivet E-703/E-704 to E-702.
* Rivet WD-605-1-R to E-702 and E-709. (Included the extra doublers).

Started back riveting the stiffeners to the bottom of the right elevator. All except the very last rivet in each stiffener. Will do these with assistance to hold the skin apart.
' style=





' style=

WD-605-1-R to E-702 Doubler

WD-605-1-R to E-702 Doubler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.